| |
Total
Project Execution
Every KLEENLine
project starts with a transport
challenge and lasts until the product
is moving down the line. We call
this Total
Project Execution. |
| |
Focus
on Sanitary Equipment
KLEENLine
builds stainless steel material
handling equipment concentrating
on relationships with companies
that handle foods, pharmaceuticals,
and other clean-room dependent products.
We apply our understanding of their
unique requirements to jump start
the design process. Adherence to
sanitary standards and compliance
with BISC, USDA, and FDA standards
is a given. |
| |
|
Full-Service
Facilities
Every
KLEENLine installation takes shape
in our new 32,000 sq. ft. facility.
There youll find: |
| |
Sheet
metal fabrication area with a full
suite of cutting, welding, polishing,
and bending equipment |
| |
15,000
sq. ft. area with 24 ft. high bay
ceilings for assembly, demonstration,
and testing |
| |
Clean
room electrical panel shop with
wiring, automation control, and
PLC programming facilities |
| |
Integrated
project management system |
|
Drive-in
loading bay and 4 loading docks |
| |
|
Hands-on
Management |
|